An engineer will use a load chart in order to determine the spacing between metal purlins.
This will depend upon the type of panel that is used and the thickness of the steel.
In heavy snow areas 500 series or greater panels are recommended and closer spacing of purlins should be considered.
We do recommend it however.
Note compliance with e2 as1 is dependent on purlin spacing and gauge of roofing.
An infill may be used between the the sheet and the apron flashing on the top edge of the roof or between the purlin and the sheet at the gutter end of the sheet to weather seal.
Corrugated roofing is a great way to top a garden shed shop or patio.
Purlins are non pressure treated 1 x 4 x 12 lumber that is installed on to the roof in a specific layout pattern and screw pattern.
Screw line spacing for metal roofing over metal purlins.
In some cases however the exact spacing of the rafters doesn t matter if the roof has other means of supporting the metal panels.
Proper spacing will offer attachment security that resulted in optimal stability.
Infills are available in the standard roofing profiles.
End purlins and periphery of roof to be fixed every 2nd crest.
The purpose of the purlins is to provide a solid foundation for the metal roofing panels and trim to be screwed to.
The spacing of the purlins needs to be arranged to suit the roofing while the rafters can be spaced as appropriate to take into account the overall weight.
The following date is based upon uniform loading of corrugated panels fastened as recommended and with a safety factor of 2 5.
The spacing of the purlins the end and side overlaps of the sheets depends on the angle of the roof for most types of sheet the following are good guidelines but check with the.
Panel basics corrugated metal panels often called tin because in the past such panels were sometimes made of tin are typically steel or aluminum sheets that are used as a roofing material.
It s quick easy low cost and you can do it yourself.
Paint or prime cut edges to prevent.
Step 3 purlin spacing.
End purlins and periphery of roof to be fixed every 2nd crest.
1 x research source the fastest option.
C3 fix side laps and miss 2 hit 1 miss 3 hit 1 miss 2 etc with approved fasteners alone.
Suntuf is supported on the structure via purlins these are the bearers that run left to right along the width of the roof the maximum purlin spacing for the corrugated profile is 800mm centres on the first and last purlins and 1 meter centres for the intermediate purlins.
Once the purlin spacing is determined then the metal roofing panels are typically attached to every line of purlins.